CTCI 中鼎集團

Featured Projects

Environmental Engineering

CTCI REI has experienced engineers in hydraulics and geotechnics to provide drainage and sewage works, flood control and retardation, landscape design and ecological Engineering.

  • Design and supervision during construction on bid No.1, No.2, No.4 of the 3rd stage of sewerage system in Fengshan and Niaosong area
    Scope:
    The scope of work including design and supervision during construction on bid No.1, No.2, No.4 of the 3rd stage of sewerage system in Fengshan and Niaosong area which Covers area of 610, 830 and 1352 hectare respectively. The main work of design and supervision the sewerage system include the following:
    • Population of service:88,000
    • Amount of domestic wastewater:22,000CMD
    • Cut-and-Cover pipes :4,150m(∮200mm~∮300mm)
    • Pipe-jacked pipes:37,350m(∮300mm~∮600mm)
    • User’s Connected drainage:25,800 households

  • Design and Supervision during construction on sewerage pipes at Kosan, Tonman and the 11th rezoning area
    Scope:
    The scope of work of this project including design and supervision during construction on sewerage pipes at Kusan, Tonman and the 11th rezoning area. The main work of this project include the following:
    • Population of service: 38,000
    • Amount of domestic wastewater: 15,000CMD
    • Pipe-jacked pipes:14,047m(∮300mm~∮800mm)

  • Design and supervision during construction on trunk and Sub-trunk seweage pipe in Chyisang Township
    Scope:
    The scope of work including design and supervision during construction on trunk and sub-trunk sewerage pipe in Chyisang township. The main work of this project include the following:
    • population of service: 25,000
    • Amount of domestic wastewater: 8,000CMD
    • Cut-and-cover pipes: 1,837m (∮=200mm~500mm)
    • Pipe-jacked pipes: 5,800m (∮=300mm~700mm)